Team Robo: Difference between revisions

From ICO wiki
Jump to navigationJump to search
Aplado (talk | contribs)
Aplado (talk | contribs)
Line 138: Line 138:


===Andreas Plado===
===Andreas Plado===
I liked this and that. Didn't like.
I would like to thank all of our teammates for the great job. During this course i learned a lot about software analysis. At first i was a bit disappointed about doing only documentation during the software making process. But later on i get used to it and i had also opportunity to learn some programming.
 
===Veiko Vainu===
===Veiko Vainu===
I liked this and that.
I liked this and that.

Revision as of 15:00, 4 April 2013

Team page for Deploying IT Infrastructure Solutions.

Team Members

  • Veiko Vainu, IT College
  • Andreas Plado, IT College
  • Giorgos Ioannidis, T.E.I. of Crete, Department Of Applied Informatics And Multimedia
  • Konstantinos Michailidis, T.E.I. of Crete, Department Of Applied Informatics And Multimedia

Goal

  • System design description, including:
    • Component diagram
    • Database diagram
    • Sequence diagram
  • Suggestion on database, programming language and reusable components.
  • Creating a project time plan with at least two scenarios:
    • Full scope
    • Minimum scope
  • BONUS:
    • Prototype solution covering some part of the system.

Activity

Monday - 25.03.13

Things what we did that day

  • Participate in lectures
  • Learn
  • We get to know each other through the exercises.

Tuesday - 26.03.13

Things what we did that day

  • Composed a set of questions for the client.
  • Started making a draft scenario for the client.
  • Researched similar systems.

Problems what we faced:

  • Lack of project details

Things what we plan to do:

  • Client meeting

Wednesday - 27.03.13

Things what we did that day

  • Met with the client
  • Clarified project details
  • We made the activity chart
  • We divided roles

Problems what we faced:

  • We didn't have problems today

Questions and answers from client:

  • We asked the basic structure of the outcome

The outcome supposed to be the analysis part of the software.


Things what we plan to do:

Thursday - 28.03.13

Things what we did that day

  • Analyse the whole scenario
  • Started making the use-case diagram

Problems what we faced:

  • We didn´t expect the scenario to be so complicated

Things what we plan to do:

  • Finish the use-case diagram
  • Start with class-diagram

Friday - 29.03.13

Things what we did that day

  • Finalized the use-case diagrams
  • Completed the first draft of the class diagram
  • Design the ERD diagram
  • Started creating the final analysis documentation


Problems what we faced:

  • The database was more complicated than we expected

Things what we plan to do:

  • Finalize the class diagram
  • Finalize the first draft of final documentation as a deliverable for our client meeting

Monday - 01.04.13

Things what we did that day:

  • Finalized the system class diagram
  • Completed the ERD diagram
  • Continue creating the final analysis documentation
  • Start creating mockups with mock up builder tool for each one of use cases

Problems what we faced:


Things what we plan to do:

  • Finalize the documentation
  • Meeting with customer at 19:00 today and find out next steps of the Project

Tuesday- 02.04.13

Things what we did that day:

  • (Yesterday)Met with the client to get feedback on what has been done so far, and what should we do from here on.
  • Finalized the description of the use-cases
  • Made changes to the ERD diagram
  • Made changes to the system class diagram
  • Completed most of the final analysis documentation
  • Researched information about possible prototype implementation

Problems what we faced: One of our team members computer malfunctioned

Things what we plan to do:

  • Make a presentation for the final client meeting
  • Practice presenting the final work
  • Finalize the documentation
  • Make a prototype of a part of the system (double elimination tree generation)

Results

Summary of what we did and solution what we developed

Final documentation

SRS Documentation (IEEE Std 830-1998)

IP Feed-back

Konstantinos Michailidis

First of all, I would like to thank everyone, which has participated to organize the program, for our accomodation etc... I was the SE project manager of the Robotics team. Also I participate in the developing section as well. I make the activity chart, some use case diagrams and the class diagram. At last, I participate to create the final documentation and presentation and export the final edition of its one. The most important part of this new experience was the collaboration with other students, that we did not know but the too intensive schedule did not let us come closer and have fun...

Giorgos Ioannidis

I liked this and that.

Andreas Plado

I would like to thank all of our teammates for the great job. During this course i learned a lot about software analysis. At first i was a bit disappointed about doing only documentation during the software making process. But later on i get used to it and i had also opportunity to learn some programming.

Veiko Vainu

I liked this and that.